MG MG4 Electric Charging Cost Calculator — Full Charge Price in Singapore
Calculate the exact full charge cost for the (64 kWh) at home or fast charging stations using current Singapore electricity rates.
Estimated Charging Cost
S$13.94
42.2 kWh needed (incl. ~10% charging loss)
Estimated Range Gained
270 km
Based on 450 km WLTP range
Frequently Asked Questions
How much does it cost to fully charge a MG MG4 Electric at home in Singapore?
Based on the current average home electricity rate of S$0.33/kWh in Singapore, a full 0-100% charge of the 64 kWh battery costs approximately S$23.23 (including ~10% charging loss).
How much does DC fast charging cost for a MG MG4 Electric in Singapore?
At the average fast-charging rate of S$0.55/kWh in Singapore, a full charge costs approximately S$38.72. Fast charging is typically 2-3x more expensive than home charging.
What is the battery capacity of the MG MG4 Electric?
The MG MG4 Electric has a 64 kWh battery pack with a WLTP-rated range of 450 km on a full charge.
How far can a MG MG4 Electric go on a single charge?
The MG MG4 Electric has a WLTP-rated range of 450 km. Real-world range may vary by 10-20% depending on driving conditions, speed, climate, and use of heating/AC.

